Stage line

A great piece of equipment just got that much better.

THREE EASY STEPS AND THE STAGE IS READY FOR YOUR EVENT

The wait is over: now you can have fully hydraulic set-up at deck level for stage, sound, lighting equipment, banners and sets.

STEP 1

Level the trailer and lower the floor panels.

Easy hydraulic operation.

STEP 2

Install sound, lighting equipment and banners at deck level. Attach up to 8,000 lbs to standard 2" tube trussing in roof. (3,630 kg to 50 mm tubing)

STEP 3

Raise the roof using the hydraulic double-mast lifting mechanism.

32' x 24' or 32' x 32' fully covered
(9.8 m x 7.3 m) or (9.8 m x 9.8 m)
to 56' x 36' (17 m x 11 m) with extension platforms

 Set-up Time: 1 hour

1 certified stage operator / 1 stagehand

 
Double Mast Roof Lifting System:
Capacity
8 000 lbs
3 630 kg
Load Bearing Capacity:
16 000 lbs
7 260 kg
 
Roof
12 000 lbs
5 450 kg
 
Sound wings
4 000 lbs
1 800 kg
 

 

Features

 

  • Sound wings - standard 1 ton rigging beams line-array rigging kit
  • Structural trusses are standard 2" (50 mm) tubing
  • Permanent grid structure with 4 additional roof pipes
  • 4 overhang pipes
  • Canopy
  • Double mast lifting mechanim
  • Vertical gooseneck
  • Floor surface clear of hydraulic arms positioned underneath
  • Hydraulic stabilizers
  • Individual control levers
  • Stage reversibility : upstage and downstage can be reversible for hard to access sites.
  • Windwalls: slide in aluminium track for easier installation and tighter fit. Clean look.
  • Aluminium platform with extruded edge
Promotional visibility
  Vertical banner supports: 12' x 18'11" (3,7 m x 5,8 m)
Horizontal banner supports: 4' x 33'5" or 46'1"
(1,2 m x 10,2 m or 14 m)
  Screen support: Heavy duty aluminium rooftop frame. Raise and lower screen to desired height
Capacity: 4,500 lbs (2,040 kg).

 

Courtesy of JHE Production Group

 

Metalworks Institute of Sound and Music ProductionMetalworks Studios